What Sets a Hardscape Built to Last Apart From One Destined to Fail?
What sets a hardscape built to last apart from one destined to fail?
The path to a hardscape built to last as long as the memories created there.
As you may know, Arborvine Landscaping offers an unmatched 10 year structural warranty on our hardscape installations. We are confident in our process, using the best industry practices, state of the art equipment and a workforce with a combined 150+ years of experience. Check out this blog on the top 8 steps that make or break every hardscape installation.
1. Dig Depth
In northern climates, like Delaware & Pennsylvania, hardscapes must be designed to endure the multiple freeze and thaw cycles we see each winter and cater to the difficult clay soil conditions. For a standard pedestrian hardscape installation, a minimum depth of 10” must be excavated to allocate space for the proper base. In commercial or vehicular applications, excavation must be deeper to withstand the additional weight & use.
After excavation, the soil conditions must be evaluated as not all soil is suitable for a hardscape to be built on top. Sometimes, additional excavation or soil stabilization is needed. A contractor that possesses this knowledge is crucial. At Arborvine, we hold ICPI certifications to ensure our team has the right knowledge and skill to build projects that last.
2. Geotextile Underlayment
Every hardscape must start with a layer of geotextile fabric to separate the sub base from the base layer. This fabric serves as a separation between the soil & gravel base. What this does is it prevents the base layer from settling into the subgrade over time, which can cause settlement of the hardscape, especially in clay soils.
This same fabric is used for our drainage & wall systems to encase drainage stone & piping, allowing water to drain without soil or sediment blocking the drainage system.
Skipping the geotextile is one of the quickest ways to a premature failure, yet it’s one many local contractors are skipping.
3. Drainage
Drainage considerations are one of the biggest aspects to consider when planning a hardscape project. It is imperative that the contractor is knowledgeable on all aspects of grading & drainage systems. At Arborvine, as NDS certified drainage contractors, we are well trained and experienced in even the most complex drainage solutions.
Each retaining wall, walkway & patio built by us is equipped with a subsurface drainage system. This perforated pipe is built in the lowest point of the base & will collect any water that finds its way under the hardscape. This water, if trapped, can lead to devastating damages of the hardscape, from freeze and thaw separation to premature settling.
We also ensure to bury & extend all downspouts in proximity of the hardscape. All walkways & patios are properly pitched to run water away from the home or other structures. When grades are tight and options are limited, our crew will incorporate catch basins or channel drains to manage water without affecting the usability of the space.
4. Base Depth, Compaction & Overbase
A minimum base depth of 6” should be installed for pedestrian applications, and this base must be compacted fully to prevent future shifting.
A key aspect to the longevity is overbasing the installation. Whether a walkway or patio, our team installs the base layer 6” past the edge of the paver surface on all sides that do not abut directly to a structure. This detail may seem small, but it’s why you’ll never see the edges of an Arborvine patio or walkway shifting or settling.
Hardscapes put pressure on the edges of the base, and if that base is flush with the edge of the pavers, that load is transferred to the soil. With the 6” overbase, the extra gravel bears that load, keeping the hardscape fully intact for decades to come!
5. Polymeric Sand
After base prep, the bedding layer is installed, pavers are set, edge restraint is installed, and polymeric sand is applied to complete the project. Polymeric sand is a fine material that gets swept into paver joints and is activated by water, where it hardens after curing.
This is a step that many can get wrong, and the consequences can be unforgiving. Simply sweeping the sand into the joints does not fully fill the paver joints and can lead to voids. This will cause bare areas to appear in the paver joints regularly, leading to a whack-a-mole type of problem.
At Arborvine, after our initial sand sweep, we run our specialized roller compactor over the pavers to settle the sand before sweeping sand across the surface again to ensure each joint is completely full! This specialized compactor is equipped with rubber rollers which allow us to properly compact the sand joints without causing damage to the pavers.
6. Patio Sealer
Protecting the pavers and sand joints will increase the longevity of the surface, reducing maintenance and keeping it looking brand new for years to come. Our crews return to all hardscape projects within 30-60 days to seal the hardscape surfaces.
The sealer not only protects the face of the pavers from stains, wear and weathering, but it also stabilizes the sand joints! The sand joints, while durable, are the first thing that should fail on a hardscape project, usually needing to be replenished on occasion. The sealer designed for sand stabilization will dramatically reduce failure and increase longevity from the sand joints.
A small detail, often overlooked, that totally changes the long term outlook of your hardscape!
7. The Right Materials
We can do everything right that you don’t see, but a poor quality paver can ruin the appearance of your hardscape. At Arborvine we are certified as Techo-Bloc Pro contractors, meaning we have been vetted & tested to guarantee that we build hardscapes that will stand the test of time. Techo-Bloc makes a wide range of products catering to all budgets, styles and applications.
With Arborvine, you get the best in process, craft & quality from the second the shovel hits the ground until the last drop of sealer is applied!
8. Design & Proposal
We believe in providing our clients with clear proposals and designs that provide a visual of exactly what our clients will get and outline the necessary steps & required materials to bring the space to life. In our proposals, no detail is left out & if you were to watch our team, you’d know line by line what they are doing and how they will do it!
This process provides peace of mind and clarity to our clients, ensuring they are confident in their investment and know our attention to detail, creativity and thoroughness are involved in each step!
With Arborvine, we strive for excellence from our design to the construction of the space. An experience crafted by care, expertise and communication creates a proven process that keeps clients coming back!
FAQs
Your questions, answered.
How deep should you excavate for a paver patio in Delaware or Pennsylvania?
For a standard pedestrian hardscape, excavate a minimum of 10” to leave room for a proper base. Vehicular applications need deeper excavation to handle the extra weight and use. After digging, the soil should be evaluated, since Delaware and Pennsylvania clay soils sometimes need additional excavation or stabilization.
Do you need geotextile fabric under pavers?
Yes. Geotextile fabric separates the soil from the gravel base, so the base doesn't settle into the subgrade over time, especially in clay soils. Skipping it is one of the quickest ways to a premature hardscape failure.
Why do paver patios sink or shift at the edges?
Edges usually sink when the gravel base stops flush with the pavers, which sends the load into the soil. Extending the base 6” past the paver edge on every side that doesn't meet a structure (called overbasing) lets the extra gravel carry that load and keeps the edges from shifting or settling.
Why does polymeric sand wash out of paver joints?
Polymeric sand washes out when it's only swept in once, because that leaves voids in the joints and bare spots keep showing up. To fill the joints completely, sweep the sand in, settle it with a rubber roller compactor, and then sweep again before activating it with water.
Should you seal a new paver patio?
Yes. Sealing within 30–60 days after installation protects the pavers from stains, wear and weathering. A sand-stabilizing sealer also strengthens the joints, which are usually the first part of a hardscape to fail.
Every Arborvine patio, walkway and retaining wall is backed by our 10 year structural warranty. Schedule your design consultation to start planning your outdoor living space.

Testimonials
-
Arborvine Landscaping is the premier choice for landscaping services in North Wilmington and the surrounding areas. Their commitment to quality is evident in their meticulous attention to detail, and their highly trained, professional crew consistently delivers top-notch results. Whether for residential or commercial needs, Arborvine Landscaping is highly recommended for anyone seeking reliable, expert service.
Steven YohayWilmington, DE -
Greg was extremely prompt with all communications and gave us a great plan for our new flower beds. The team completed the job right on schedule – we love the new look!
Lou CamarattaWilmington, DE -
Arborvine designed and constructed a new front stoop with two steps and a walkway from the driveway. They gave excellent advice and helped us select materials that would look nice and function well. They have a good aesthetic sense — the new hardscaping is pleasing to the eye. They were careful with existing plantings and repaired or replaced them as needed. They are very friendly and professional.
Steven ZimmermanWilmington, DE -
Punctual, professional, quick and thorough. Greg was great to work with and Angel and crew did a fantastic job. Would recommend Arborvine for any landscaping project!
Abby HughesWilmington, DE -
We moved into a home that had not been upgraded outside and was in need of new landscaping. We
wanted to add an outdoor kitchen as well for our anniversary. The work in the front of the house and also the outdoor patio and kitchen were higher than our expectations. Arborvine has turned our backyard into an Oasis! Love the work that was done. We are keeping them for our maintenance. People are stopping us and praising the front of the house upgrade. Highly Recommend.
Laura KellerWilmington, DE -
Greg and the Arborvine crew did an excellent job on a design-build project for us late last year. We had steps added from our raised patio to our backyard. They added a planting area near the driveway, bluestone steps, boulders, shrubs on the side, river rock borders, smaller river rock under the patio (which looks great now instead of a mud hole), and made it all look perfect. What really impressed me was the response time on questions and changes before any money changed hands, AND the ease at which changes were accommodated during and near the end of the project. I’ve seen some contractors take a week or more to return email/calls, but Greg was nearly immediate! Highly recommended and I’d use Arborvine again in a heartbeat – without getting other quotes!
Dave TealWest Chester PA -
Love the workmanship, professionalism , design, and outcome of our outdoor project. Always on time, friendly, beautiful workmanship, cleaned up every day and on final day. Would highly recommend Arborvine for anyone. Thank you for an amazing outcome!
Karen RockwellSpringfield, PA -
Great to work with and really captured the look we wanted. Reliable and always available for questions. Along with landscaping they installed pathway lighting and they did a great job.
Carol AruffoChadds Ford, PA -
These guys are great and really know their stuff. First off the provided a very detailed proposal with a clear plan that was easy to understand and showed they knew exactly what the project needed in concrete terms… including a list of itemized supplies needed. They were able to come sooner than anticipated even having their schedule pushed back with all the recent rain. Their employees were all super friendly and knowledgeable and worked very hard under very hot conditions to knock out the job correctly and in a timely fashion. They also provided detailed maintenance instructions for watering (sod and plant) and drainage system. Correspondence and communication top notch with personal emails sent with updates on progress. Highly recommend and will be using them again for future projects.
Geoffry GiordanoWilmington, DE -
Dealing with Greg was excellent. The contract was detailed and every detail was fulfilled. I appreciated the communication as every text with a question had a very quick response. As for his crew that did the work, they were such hard workers. They showed up on time for work every day and I’m very pleased with the outcome. I would highly recommend Arborvine Landscaping.
Marene MiastaMiddletown, DE